Windstorm law
Windstorm inspector rules for roofers: the paperwork before tear off
For a roofer on the coast the certificate is decided by paperwork on either side of the job and by one inspection in the middle of it. Here is what the statute and the department say about each.
Published
Roofers inside the catastrophe area learn the windstorm program one bad week at a time: a crew held off a roof, a homeowner who cannot get coverage bound, a certificate that never comes. The rules behind each of those outcomes are written down, in section 2210.2515 of the Insurance Code and on the department's inspection process page, and they are worth reading before the tear off rather than after.
A re-roof is an improvement
Section 2210.2515(a) defines an improvement as the construction of, or repair, alteration, remodeling, or enlargement of, a structure to which the plan of operation applies. Replacing a roof is a repair or an alteration. It sits inside the same certificate section as a new house, which is why a coastal re-roof needs a certificate at all.
Before anyone climbs a ladder
Subsection (b) requires written notice to the department, on its prescribed form, of the intent to repair or alter the structure before beginning. The department's process page identifies that form as WPI-1, the application for a certificate of compliance, and says it is submitted to notify the department before construction begins. The obligation is stated for the person seeking coverage, which is why an owner who assumes the roofer filed it and a roofer who assumes the owner did end up in the same place.
The city permit is a separate track. Corpus Christi, Portland, and Rockport each run their own building department, and satisfying one of those does nothing for the windstorm program, or the other way around.
Who can be the windstorm inspector, and when they come
The department's page says a TDI inspector or an appointed Texas licensed professional engineer must inspect construction and repair work, and that TDI inspectors can inspect all non-structural work including most repairs, alterations, and re-roofs. Section 2210.254 says a windstorm inspection may be performed only by a qualified inspector who has been approved and appointed or employed by the department, which is what the statute means by a windstorm inspector: a person the department qualified by training or experience, a licensed professional engineer, or an inspector holding the code body and coastal construction certifications that section lists.
Timing is the part crews feel. TDI inspectors try to conduct inspections within 48 hours of the requested date, excluding weekends and holidays, and all inspectors must see the work in progress, during the repair and not before or after it. On a roof, the deck attachment an inspector needs to see can be covered within the same day it is exposed. Requesting the inspection only once the shingles are on asks the inspector to certify something that is no longer visible.
When the inspector finds a problem
If the work does not comply with the applicable construction requirements, the department's page says the TDI inspector will post a notice at the job describing the problems, and will return for a reinspection after they have been corrected. The notice is the list to work from. Correcting something that was not on it, or covering an item before the reinspection, restarts the argument rather than finishing it.
After the last inspection
Where an appointed engineer inspected, the department's page says the engineer provides the WPI-1 and the WPI-2-BC-1 series forms upon final inspection, and that although the engineer should submit them to the department, they may also be mailed, faxed, or emailed.
Then the clock in subsection (e) applies. The department may not issue the certificate for an ongoing improvement if, within six months after the date of the final inspection, it has not received fully completed forms and payment in full of all inspection fees owed to it, including fees for earlier inspections. A roof can pass and still never be certified because the paper behind it stopped moving.
Once the certificate does issue, subsection (k) says the department may not rescind it. The full section is read through on the certificate of compliance page.
A roofer's list for a coastal job
- Confirm the WPI-1 has been submitted, and by whom, before the tear off.
- Know whether a TDI inspector or an appointed engineer will inspect this roof.
- Request the inspection for the day the deck and its attachment are exposed, allowing for the department's 48 hour target and for weekends.
- If a notice is posted, correct what it lists and keep it visible for reinspection.
- After final inspection, make sure the forms reach the department well inside six months.
Sources
Every claim above, and where to check it
Primary sources only. Where something could not be traced to one, the page says so rather than repeating it.
- Tex. Ins. Code § 2210.2515, Issuance of Certificates of Compliance (opens in a new tab)
The definition of improvement, notice before work, the six month limit after final inspection, and the bar on rescinding a certificate.
- Tex. Ins. Code § 2210.254, Qualified Inspectors (opens in a new tab)
That a windstorm inspection may be performed only by a qualified inspector approved and appointed or employed by the department.
- Texas Department of Insurance, Windstorm Inspection Process (opens in a new tab)
Form WPI-1 before construction, who may inspect, re-roofs as non-structural work, the 48 hour target, that inspectors must see the work in progress, the posted notice and reinspection, and the forms an appointed engineer provides at final inspection.
Questions
Common questions
- Does a TDI inspector or an engineer inspect a coastal re-roof?
- The department's inspection process page says TDI inspectors can inspect all non-structural work including most repairs, alterations, and re-roofs, and that a TDI inspector or an appointed Texas licensed professional engineer must inspect construction and repair work.
- What happens if a roof fails its windstorm inspection?
- According to the department, the TDI inspector posts a notice at the job describing the problems and returns for a reinspection after they are corrected.
More analysis
Related reading
- The Texas Professional Services Procurement Act
- What a Texas engineering firm registration is
- The engineer of record in Texas, and what actually governs it
- How to look up a Texas PE license, and what the roster leaves out
- TWIA insurance eligibility, read from the Insurance Code
- TWIA coverage for homes built before 1988, and where the date stops helping
- Texas windstorm certificate lookup: the TDI search, the TWIA window, and what neither proves
- Texas windstorm certificate: what section 2210.2515 actually requires
- Ongoing vs completed improvement, and why a deed decides the windstorm route
- Post-construction evaluation reports: what the engineer affirms and answers for
- Engineer letter vs windstorm certificate: which one the association may rely on
- Roof certification for insurance, and why it is not a WPI-8
- Inspection vs forensic report vs certificate, three different coastal documents
Start a job
Tell us what the letter is for and we will tell you yes or no
Send the address, what the document is for, and the date it has to be in hand. Some jobs this firm cannot take, and you will hear that in the first conversation rather than after you have paid and waited.