Service line
Solar Structural Letters for Texas Installations
The sealed structural review most Texas jurisdictions require before a rooftop solar permit is issued: the existing framing and each attachment under the gravity load of the array.
Updated
$709, plus $75 in first tier coastal counties
What it is
Solar Letters, in plain terms
The sealed structural review most Texas jurisdictions require before a rooftop solar permit is issued: the existing framing and each attachment under the gravity load of the array.
A solar structural letter is the sealed engineering review a building official asks for before permitting a rooftop photovoltaic array. It answers one question in writing: can this roof structure carry this array, attached this way, under the loads that apply at this address.
The review takes the existing framing as it is. Rafter or truss size, spacing, span, and species, along with the condition of the members, are recorded from the field, together with the array layout, the racking system, the attachment type, and the spacing of the standoffs. The weight of the array is applied to that framing as gravity load, including the load at each attachment, under the applicable edition of the International Residential Code or International Building Code. Wind uplift is not calculated, and the letter says so.
The answer belongs to the roof rather than to the product. The same array on two houses with different rafters, spans, or member condition gives two different answers, which is why the letter is written for an address and a measured roof rather than for a racking system.
Who orders one
The people who need this document
- Solar installers and EPCs assembling a permit package
- Homeowners whose jurisdiction has returned a permit application asking for an engineer's letter
- Commercial owners adding a ballasted or attached array to an existing roof
- Racking and equipment suppliers supporting a dealer network across multiple jurisdictions
Further reading: Engineer's letter for a solar permit in Texas: when a city asks for one.
The deliverable
What arrives at the end
- On a pass determination, the engineer issues a sealed letter addressed to the recipient recorded at intake, for the purpose recorded at intake.
- The letter identifies the property, the date of inspection or of the installer's survey, the existing roof framing as observed, the adopted code and the loads used, and the array design by its date and revision: module, module count, racking, attachment type, attachment spacing, and layout.
- The letter states the engineer's opinion that the existing roof structure is adequate to support the array as described.
- The letter states that it is void if the modules, racking, attachment pattern, or layout change from the array design it names.
- The letter states that it does not cover the design of the modules, racking, or attachment hardware, the waterproofing of penetrations, the electrical work, the condition of the roof covering, or wind uplift on the array or on the framing.
What an order asks for
Worth having to hand. Nothing here is unusual, and an order that arrives with it moves without anybody having to telephone back.
- Why do you need this
- What kind of property
- A photograph of the front of the property
Where it matters most
Regions where this work carries the most weight
Coverage is statewide. These are the regions whose conditions put this service near the front, and why.
Questions
Common questions
- Does every Texas jurisdiction require a structural letter for solar?
- No, and it is worth checking before ordering one. Requirements vary by authority having jurisdiction and by the size and attachment method of the array. Many cities require a sealed letter for any rooftop array, some require one only above a threshold, and some accept a manufacturer's certification for a listed racking system.
- What information does an engineer need from the installer?
- The address, the array layout and module count, the module weight, the racking system and attachment hardware, the standoff spacing, and framing measurements taken on site: member size, spacing, span, and species where it can be determined. Photographs of the attic framing are worth more than a description of it.
- What happens if the existing framing will not carry the array?
- The letter says so, with a written list of what has to change. Where the array itself can change, a revised design from the installer is recalculated without another visit. Where the structure has to be strengthened, that design is a separate engagement, and the finished work is verified on a return visit before any letter of adequacy is issued.
- Is a ground mount treated the same way?
- No. A ground mount is a foundation and a frame rather than a review of existing roof framing, so it is a design task with its own soil and wind considerations. It is a different scope with a different deliverable.
Start a job
Tell us what the letter is for and we will tell you yes or no
Send the address, what the document is for, and the date it has to be in hand. Some jobs this firm cannot take, and you will hear that before anybody is sent to the property.
$709, plus $75 in first tier coastal counties
