Service line
Structural Letters for Permits in Texas
The sealed letter a building department asks for, in writing, when it needs an engineer's opinion on a described structure or element before it issues or closes a permit.
$709, plus $75 in first tier coastal counties

What it is
Structural Letters, in plain terms
The sealed letter a building department asks for, in writing, when it needs an engineer's opinion on a described structure or element before it issues or closes a permit.
A structural letter for permit answers one written request from a permitting authority: an engineer's opinion that a described structure or element satisfies the requirement the authority named. The request is recorded as written and attached to the file, and the letter answers that request and nothing else. A request the owner can only describe is not enough to start from.
Where the letter concerns existing construction, which is most of them, it rests on a technician's visit: the element is measured and photographed in place against a job list the engineer writes, and photographs a customer supplies do not stand in for that. Only a letter that can be answered from drawings and documents alone is written without a visit, and the engineer decides which at acceptance.
What a letter does not do is design. Sizing a new beam for a wall that is coming out, drawing a detail, or setting out a repair method is design or a repair specification, each its own engagement, and a request that needs one is routed there. The letter states its opinion on the element named, with the date of inspection, and says plainly that it does not cover the rest of the structure or anything concealed.
Who orders one
The people who need this document
- Homeowners and remodelers whose building department has asked in writing for an engineer's letter
- Contractors answering a failed inspection or a plan review comment about an existing element
- Owners closing a permit on work the authority wants an engineer to confirm
- Architects and designers who need one existing condition confirmed for a permit file
- Contractors correcting work that was done without a permit and is now being inspected
Further reading: The structural engineer report, read the way an agent or a lender reads it.
The deliverable
What arrives at the end
- On a pass determination, the engineer issues a sealed letter addressed to the permitting authority recorded at intake.
- Where the element satisfies the requirement subject to conditions, the letter says so and states each condition in an attached schedule.
- The letter gives the property, the permit number, the authority's request as written, the element described, the adopted code, and the evidence and documents the opinion is based on, with the date of inspection for a site job.
- The letter states the engineer's opinion on the element against the request. It gives no opinion on anything the authority did not ask about.
- The letter states that it does not cover the rest of the structure or any concealed condition, and that it reflects condition on the date of inspection only.
What an order asks for
Worth having to hand. Nothing here is unusual, and an order that arrives with it moves without anybody having to telephone back.
- Why do you need this
- What kind of property
- A photograph of the front of the property
- What the permitting authority asked for
- Which city or county is the permit with?
- What is the letter about?
- Describe the element the letter is about
- The permitting authority's written request
Where it matters most
Regions where this work carries the most weight
Coverage is statewide. These are the regions whose conditions put this service near the front, and why.
Greater Houston
Dense municipal permitting means alterations routinely need a sealed letter.
Dallas Fort Worth
Dense municipal permitting means most alterations need something sealed.
San Antonio
Active municipal permitting across the region's incorporated cities.
Austin and Central Texas
Demanding municipal review makes sealed documentation routine.
Questions
Common questions
- When does a Texas building department require a sealed letter?
- It varies by jurisdiction and by scope. Removing or altering a load bearing element, adding an opening in a shear wall or a masonry wall, and changing the load path in any way are the usual triggers. Many departments will tell you plainly at plan review, and it is worth asking for the request in writing, because the letter answers it as it was written.
- Can a letter be issued without anyone visiting the site?
- Only where the letter can be answered from drawings and documents alone, and the engineer decides that at acceptance. A letter about existing construction rests on a technician's visit, and photographs a customer takes do not replace it. An engineer who seals a member based on a homeowner's description of the attic is sealing a description, not a structure.
- What if the wall is already out?
- The engineer can give an opinion on what is in place now against what the authority asked. If something has to change, the letter says so with a list of what. Designing the fix is a separate engagement, on the design or the repair specification line.
- Is a letter cheaper than a full plan set?
- Usually, because it is a smaller scope. The judgment worth making is not which is cheaper but which the permit needs. A letter covering a project that genuinely needs drawings will be rejected at review, and the project pays for both.
Start a job
Tell us what the letter is for and we will tell you yes or no
Send the address, what the document is for, and the date it has to be in hand. Some jobs this firm cannot take, and you will hear that before anybody is sent to the property.
$709, plus $75 in first tier coastal counties
